Sunday, May 27, 2018

Table WIP, Part 2: Layout

Another sunny day. A little more work done. The short pieces around the edge are not attached yet. The cross beams by the TV frame are screwed in. I also cut holes for attaching the table legs, but I later realized they'll need to be a little bigger.


The stuff lying about the table is me trying to make sure things will fit where I want the. The cookie tin is standing in as the template for cut-in dice rolling trays. You can also see the cup holders, speakers, and the power outlets.


The Chromebox will run the player-view Roll20 interface on the TV screen. You can't see very well in this shot, but I drilled several "vents" into the board underneath for airflow purposes.

Monday, May 21, 2018

Table WIP pics, part the first

The sun finally came out, and my wife & I had a chance o do a bit of work on the table.


The frame is to hold the TV screen. The particle board will be the bottom layer of the table itself. I wanted the screen slightly offset from center to give the "DM's end" a little more room. We then traced where to cut an opening for the frame.


Once the hole was cut, we put he frame inside. It was a pretty tight fit, but that's good! The, because particle board doesn't have a lot of structural strength, we glued and screwed two 2x4's on either side. these will also be part of the frame that holds the top layer up and divides up the 'cubbies' that the players can use for books, etc. 

At this point in the afternoon, we need to let the wood glue dry and there was food to cook and children to ferry to activities. The next steps should go fairly quickly, as we'll just be cutting and attaching lengths of 2x4's to complete the framing. After that, we'll work on the top of the horizontal surface. I also need to cut out the corners of the particle board to make room for the table legs.

Friday, May 18, 2018

Rain, rain, go away


I haven't forgotten about posting WIP pics. Progress on the table has stalled because it will simply NOT. STOP. RAINING.