Monday, June 25, 2018

Table WIP: Part something. Staining

The table legs got stained about a week ago, but weather and schedules made more work impractical for the last several days.

This afternoon after work was gorgeous, so I took the top and the panels out to work on. The base was too heavy to move on my own and I lacked my normal beautiful assistant (my wife).
I'm using a Minwax chestnut that is stain + polyurethane in one.  

The little finger hole in the corner of the display cover is to let me lift it out of the opening more easily. The smaller panel (top) will cover the Chromebox section.


There is some work unrelated to the table that has to happen in the basement before final assembly occurs. But I am getting closer!

Friday, June 15, 2018

Table WIP: Getting There

The top of the table has been cut and sanded. I also cut and assembled the table legs yesterday.




The large circular holes will be dice-rolling trays. The medium holes are for the cup holders. The center holes is for the TV screen. The two small round holes are for the speakers. The big corner cut out is for the "access panel" to reach the ChromeBox inside the table. It runs the TV display. 

There is also a tiny hole on the far side of the TV from the speakers. It will hold a small USB mic for sound pickup that will hopefully allow anyone playing remotely via Roll20 to hear the other players. There is another small mic attached to my laptop that will be at the "DM side" of the table (corner across from the Chromebox). Hopefully the mics will be far enough from each other the speakers to avoid feedback (The TV sound will be muted).


I meant to glue the table leg pieces together as well as using the wood screws, but I forgot. Each leg is held together by three screws, so they are pretty secure. I still need to drill the holes for the securing lag bolts into the frame and the legs. There will be two per leg. 

If the weather holds, I will stain the table this weekend. Then I will be able to run the wires for the outlets, etc. and attach the tabletop to the frame. The legs won't get attached until I can bring it inside and down to the basement.

Monday, June 11, 2018

Some progress

I managed to complete the framing of the 2x4s this weekend and cut the holes for the cables. I also marked out where I need to cut through the top piece of wood for the TV screen. etc. I bought the stain and I had to get some more 2x4 for the table legs. If I can get 2-3 more sunny days, I can finish this thing off. At least the parts that need to be done outside.